And normally I am not detailed oriented at all nor do I get bothered by the small stuff, but on this project the small stuff just annoyed me to no end. So as we only a have a few days left, I will be happy for it to be finished. Its been a long, good project.
So the floor of the main room despite what I said above looks amazing:
The dark tile colors match the outside of the building's orange & dark brown colors beautifully. And once completed this main room which will mostly be used as a school room will hide much of the children's dirt and since the tiles are ceramic they should withstand the abuse provided they arent dropped heavy stuff on them.
Some work in progress photos:
And just some more flooring photos.
Ok for comparison of the opening paragraph.
The main idea was for the full size bigger white tiles to ring the outside & darker ones are the inside with a nice dialog pattern. But sense the room is not a perfect square and the door area has extra room. He decided to base the wall tiles from the edge of the door so when you first walk in it all looks right & in align. But when the doors are closed one wall has smaller white tiles. The photo above on left shows the way its supposed to be. See the photo above on the right for the contrast of the white tiles sizes. And the photo to the right is the front door with the full tiles to see the decision. Hope that makes sense.
I don't think they have squirrels in Swaziland but one did come to the door.
Great, great, great ... and love the squirrel ... it is what it is ... and things all work out.
ReplyDeleteThe squirrel could be a 'young out of the water' walrus. Love the floor, no matter which way the tiles are pointing.
ReplyDelete